Wind turbine blade on a multi-axle heavy-haul trailer
Project Cargo
Project Cargo
Hamburg Port, DE
Wind farm site, Poland
0
Safety incidents

Moving a 120-ton turbine across three borders

An oversized wind turbine delivered on schedule, with zero safety incidents.
Client:
Halden Energy
Industry:
Renewable Infrastructure
Cargo Type:
Oversized turbine assembly (120t)
Timeline:
11 days, escorted
Technician checking the hydraulics of a heavy-haul trailer
CHALLENGE
An oversized wind turbine assembly needed specialized transport, detailed road surveys, and permits across three jurisdictions. A single misstep could have halted the whole convoy for days.
120t
Single-piece cargo moved
-15%
Vs. original estimate
Heavy-haul convoy moving a turbine section along an empty highway
SOLUTION
We engineered a multimodal route using modular trailers, ran escorted night convoys to avoid traffic restrictions, and centralized every permit through a single management desk in Hamburg.
  • Efficient operations
  • Transparent process
  • Adaptive logistics
Client Testimonial
“Complex, oversized, cross-border, and it still arrived exactly when they said it would. Every permit, escort, and night move was planned to the hour, and the site crew never waited once.”